Tienen Sugar Factory, Belgium

Project duration: 2020–2024
Throughput: 14,500 t/d
phone mail whatsapp
Tienen Sugar Factory, Belgium img

Raffinerie Tirlemontoise S.A. – Tiense Suikderrraffinaderij N.V.

Location

Tienen, Belgium

Facts

BMA supplied and assembled the entire extraction plant as a turnkey solution.

Scope of supply

  • Extraction plant
  • Countercurrent cossette mixer
  • Extraction tower
  • Steel structure
  • Piping
  • Electrics
Rafinade sugar

BMA Services

  • Engineering
  • Assembly of the plant
  • Electrics
  • Piping
  • Assembly supervision
  • Commissioning

Technical Data

Capacity of the extraction plant 14,500 t/d
Upgrade possible to 17,000 t/d
Countercurrent cossette mixer Ø 7.5 m, length 9.5 m
Extraction tower Ø 12.0 m, extraction length 25.38 m
Annual reduction of CO2 emissions 6,000 t
Water savings 150,000 m³

Scope of the project

01

2020

BMA is awarded contract.

2022 – 2023

Delivery and assembly.

02

03

2023

Start of commissioning.