Raffinerie Tirlemontoise S.A. – Tiense Suikderrraffinaderij N.V.
Location
Tienen, Belgium
Facts
BMA supplied and assembled the entire extraction plant as a turnkey solution.
Scope of supply
- Extraction plant
- Countercurrent cossette mixer
- Extraction tower
- Steel structure
- Piping
- Electrics

BMA Services
- Engineering
- Assembly of the plant
- Electrics
- Piping
- Assembly supervision
- Commissioning
Technical Data
| Capacity of the extraction plant | 14,500 t/d |
| Upgrade possible | to 17,000 t/d |
| Countercurrent cossette mixer | Ø 7.5 m, length 9.5 m |
| Extraction tower | Ø 12.0 m, extraction length 25.38 m |
| Annual reduction of CO2 emissions | 6,000 t |
| Water savings | 150,000 m³ |
Scope of the project
01
2020
BMA is awarded contract.
2022 – 2023
Delivery and assembly.
02
03
2023
Start of commissioning.