References

phone mail whatsapp

Tienen Sugar Factory, Belgium

  • Capacity of the extraction plant: 14,500 t/d
  • Upgrade possible: to 17,000 t/d
  • Countercurrent cossette mixer: Ø. 7.5 m, length 9.5 m
  • Extraction tower: Ø 12.0 m, extraction length 25.38 m
  • Annual reduction of CO2 emissions: 6,000 t
  • Water saving s: 150,000 m3

Dhaka Sugar, Bangladesh

  • Refinery capacity: 3,000 t/d
  • R1 sugar: 10 % with up to 18 IU
  • R1-R4 sugar: 90 % mixture with up to 45 IU
  • Sugar yield: 98%
  • Steam consumption: up to 0.73 t/d